Infrastructure

  1. Nybron is one of two bridges connecting Härnön to the mainland. The current bridge was inaugurated in 1937 and needs to be replaced by a new one. The construction will last from 2024 to 2026.

  2. Nybrogatan is Härnösand's main street. One kilometer long, it stretches from Härnösand Central, over Nybron, through the city center and to Villa Nybo at the top of the hill. Nybrogatan is in great need of renovation, both in terms of traffic...

  3. A new, safe pedestrian and cycle path will be built to Smitingen. The project will be completed in spring 2026, at the same time as the new Smitingen campsite opens.

  4. Skeppsbron has great potential to become an attractive marine and green route from the city center to the bathing area at Sälsten. In the vision, the route may be filled with cafés and restaurants with outdoor seating, shops, activity areas, quays...

  5. Utsprångskajen is located at Skeppsbron, in central Härnösand. In 2025-2027, the quay will be renovated into a modern quay that can complement the deep harbor and accommodate smaller vessels. At the same time, the quay itself can become a meeting...